Production Schedule

To begin with we decided we would shoot the whole film in one day. We thought we could get it all done in the space of a few hours as it was a small production which was set in one location - Sutton Park. We thought that if we shot it all at once they wouldn't be continuity errors such as: different lighting etc. However, this was not the case due to conflicting schedules. When we originally planned to shoot it Harmesh was not available to participate on that day.  Therefore we decided that it would be better to shoot the video on two different days, and on the first shooting we would film any performance shots needed for the film where only Faye was only needed and to get them out of the way and done with, so we could have something to start editing together during the wait for when Harmesh would be available for filming. For the second shooting Harmesh and Faye would both be there to shoot the flashback scenes and any other shoots which we needed.


First Day of Filming:
  • When: 
Date – Tuesday 15th November
Time – 1.30pm – 4.00pm

  • Where: 
On location in Sutton Park. This is where the majority of shots will be filmed except for one shot which is on the street side by Sutton Park.
All park shots to be done in daylight and street shot to be filmed when dark

  • Who: 
Actors – Faye Slater
Director/ Camera Person – Laura Sheasby
Props – N/A
Equipment – DV camera and Tripod

  • What:
Shoot any shots needed where only the ‘ex-girlfriend’ was performing. 



Second Day of Filming:
  • When: 
Date – Saturday 19th November
Time – 1.30pm – 4.00pm


  • Where:

On location in Sutton Park. This is where the all shots will be filmed.

  • Who:

Actors – Faye Slater, Harmesh Kalair
Director/ Camera Person – Laura Sheasby
Props – N/A
Equipment – DV camera and Tripod

  • What:

Film all shots which feature the girlfriend and boyfriend. Also, any other shots which as needed which will have not been shot on previous day. 